VMC widens canal for flood control

As part of flood management efforts, the current canal in New Barrio, Canetown, Victorias City has been widened and deepened. On the right, VMC workers conduct clearing operation in preparation for widening and deepening of the canal.
As part of flood management efforts, the current canal in New Barrio, Canetown, Victorias City has been widened and deepened. On the right, VMC workers conduct clearing operation in preparation for widening and deepening of the canal.

VICTORIAS Milling Company (VMC) recently completed the clearing, widening and deepening of the canal in New Barrio, Canetown, Victorias City for flood prevention especially with the advent of the rainy season.

Joseph George Sta. Ana, head of VMC’s Civil and Design Construction said they were able to double the size of the canal.

“Before the construction, the canal dimensions were from one to two meters wide with a depth of two to 2.5 meters and 430 meters long. After the civil works, we doubled the canal size to three to four meters, and three to 3.5 meters deep,” Sta. Ana went on.

New Barrio kagawad Edmund Liza expressed gratitude for the canal-widening project as “this will surely help the flooding problem that has greatly affected our community.”

Liza added that he will mobilize their neighborhood to ensure its maintenance and will seek the help of the local government unit to help in the needed riprapping of the area.

Kagawad Brady Sombero, on the other hand, stated that this is “very timely” as they are usually beset with flooding problems “especially from October to February when the rains come. The clearing and widening of the canal have eased the anxiety of our residents in flood-prone areas.”

“We hope and pray that the flood preventive measures that were implemented will finally put an end to the flooding we have been experiencing,” according to Sombero./PN

LEAVE A REPLY

Please enter your comment!
Please enter your name here